This project aims to fix the ditch and basin issues on the Bullerman Ditch between Maplecrest Road and Maple Terrace in order to help with flooding which is affecting the surrounding residents yards. This project is currently in the design phase.
Engineers are working to design a plan that will help make part of the Bullerman ditch an inline ditch, expanding the capacity of the basin to help alleviate flooding in the area.

Project Area

Design Meeting (6/9/2025) Documents:

Public Meeting Presentation

Bullerman Drainage Map Boards

Bullerman Drainage Plant Palette

Bullerman Aerial #1

Bullerman Aerial #2

Contact

Eric Ruppert

Construction Manager

Flooding in the Bullerman drain.
Drain flooding
Flooding behind residents in the Bullerman Drain improvement project area.
Standing water, flooding local wildlife.
Flooding behind residents in the Bullerman Drain improvement project area.
Flooding in residents yard near drain
an aerial of the Bullerman Drain improvement project area.
Area of planned construction