Project Overview

Expected completion date: May 2025

City Utilities is replacing water main lines for residents along Stellhorn Road, between Hobson Road and Maplecrest Road. This project involves replacing over 2 miles of water main lines. The current cast iron water pipes will be replaced with high density polyethylene pipes.

This water main replacement project is necessary to reduce water main breaks and increase fire flow capabilities. This project is a component of Fort Wayne’s ongoing master plan to improve the city’s water delivery system and reduce disruption. The new water main lines will be flexible and durable, where as the current water main lines are thin and susceptible to corrosion.

stellhorn

Contact

Shawn Bellinger

Construction Contract Manager

A graphic of construction crews working along a sidewalk as they watch the new water main pipe be placed along the street.
April 2025: Pipe installation
Exposed grass, after the bulldozer dug up the yard to expose the old water main.
April 2025: Old pipe exposure
A bulldozer digging up grass to begin working on utility work at the corner of a sidewalk in a neighborhood.
April 2024: Restoration