Week of August 17, 2021: Crews were busy grouting in all areas around the 60-inch diameter pipe at drop shaft #5 (Thieme Drive). Inside the tunnel, crews are preparing the area to begin installing the adits that will connect drop shafts to the tunnel and have been removing utilities used by MamaJo.