Work on the drop shaft between Brown Street and Hale Avenue is seeing progress with the drop shaft with the installation of steel pipe. This drop shaft is one of seven locations under construction. The second photo shows excavating equipment being lowered into a drop shaft at Camp Allen Drive. These shafts will deliver combined sewage to the tunnel and will keep it from discharging into our rivers.