← Return to MamaJo Updates

50 Ton Casing Installed

The Drop Shaft at Camp Allen, near Main Street and the St. Marys River, is moving along. This week a 50-ton casing was installed. Click here for video of Camp Allen Casing

Photo of pieces of the Tunnel Boring Machine arriving with police escort.

MamaJo Tunnel Boring Machine police escort