Drop Shaft and Consolidation Sewer Work

Drop shaft and consolidation sewer work continues along the tunnel route. Looking back to photos from the week before you see dramatic photos at drop shaft 7 – Guldlin Park. To give perspective on the structure in these photos — it’s about 30 feet, 60 to bottom.

 

Drop shaft 7 at Guldlin Park – Week of Oct 26

tying rebar
installing closure strips

Work at Thieme and Berry continues with a consolidation sewer and drop shaft 5 are under construction. Photos below show crews placing whalers – on first photo the drop shaft is visible on the right hand side. Week of October 26

installing wailer supports
placing wailer beam