Drop shaft and consolidation sewer work continues along the tunnel route. Looking back to photos from the week before you see dramatic photos at drop shaft 7 – Guldlin Park. To give perspective on the structure in these photos — it’s about 30 feet, 60 to bottom.
Drop shaft 7 at Guldlin Park – Week of Oct 26
Work at Thieme and Berry continues with a consolidation sewer and drop shaft 5 are under construction. Photos below show crews placing whalers – on first photo the drop shaft is visible on the right hand side. Week of October 26