Work continues at the neighborhood drop shafts, the shafts will intercept flow that currently goes to the river and drop it down to the tunnel. In this photo, grouting work is going on at drop shaft 6 near the Camp Allen Drive at West Main Street.
Posted on August 8, 2019
Work continues at the neighborhood drop shafts, the shafts will intercept flow that currently goes to the river and drop it down to the tunnel. In this photo, grouting work is going on at drop shaft 6 near the Camp Allen Drive at West Main Street.