Progress continues for the tunnel and several connecting projects. MamaJo is under the Swinney Park pond this week.

Photos below are the Third Street Consolidation Sewer project – going under the river.  Photo on the left shows the sheeting that his holding back the water and on the right you can see the form and if you look to the right hand corner of the photo you see a work, that would actually be under water if it wasn’t for the sheeting.  At the top of the photo you can see the inside of the sheeting wall that surrounds the workers. Week of November 23, 2020.

sheeting
mamajo site

At drop shaft #7 below (Guldlin Park) you see on the left photo how deep the workers are as you can count the rungs on the ladders.  On the right you see the concrete forms and the drop shaft at the top.  Week of November 23, 2020.

removing tie rods
slab forms