Worker being lowered into the 65-foot diameter pump station shaft and photo of MamaJo’s used cutterheads and new ones that will be used to continue cutting through the bedrock.


Posted on July 9, 2019
Worker being lowered into the 65-foot diameter pump station shaft and photo of MamaJo’s used cutterheads and new ones that will be used to continue cutting through the bedrock.