Tunnel segments were constructed to build the first test ring for inspection. This will be the 1-foot diameter interior wall of the tunnel.
Posted on June 29, 2018
Tunnel segments were constructed to build the first test ring for inspection. This will be the 1-foot diameter interior wall of the tunnel.