← Return to MamaJo Updates

Work continues at DS 5 – Thieme Drive

July 12, 2021 – Work continues at DS 5 – Thieme Drive.  Photo on left shows manhole piping arriving late last week on a flatbed and on the right the photo shows portions that have been installed this week.

Manhole pipe arriving on a flatbed.      Portions of that have been installed this week.