← Return to Projects

Rolling Hills Drainage Improvements

Page last updated May 9, 2025

Project Overview

Expected completion date: December 2025

A Google Maps of the Rolling Hills project area.

Project Area

City Utilities plans to correct the drainage issues in the Rolling Hills neighborhood, specifically around West Hills Road and Rolling Hills Road. This project aims to install a new storm pipe, new beehive castings and inlets to alleviate road flooding as well as increasing the storm sewer pipe near the neighborhood to combat minor road flooding. Grass restoration is also planned around the newly installed storm sewer structures.

Numerous resident complaints have been made regarding yards being flooded and storm water pooling into neighborhood streets. The current storm pipe is need of an upgrade to control storm water in the area.

Contact

Nick Rupley

Construction Manager

A Google Maps of the Rolling Hills project area.
Project Area
Photo of the front yard of a residence with flooding in the yard.
Photo of standing water surrounded by snow.
Photo of a residential neighborhood with trees that have standing water below them surrounded by snow.
Photo of standing water next to an evergreen with snow surrounding the standing water.
Photo of a residential neighborhood in late spring or early summer with a large tree surrounded by standing water.