← Return to Projects

Sunny Meadows Stormwater Improvements

Page last updated February 11, 2026

Expected Completion Date: TBD

City Utilities will be working in the Sunny Meadows neighborhood to help alleviate stormwater issues. The neighborhood has been experiencing standing water  (pictured below) near ditches and on roads  following rain events and has been ongoing problem to residents in the area. Construction will help alleviate these issues by the installation of storm ditches, sewers and other structures. Any pavement, driveway or yard disturbed by construction will be fully restored.

If you missed any previous pubic meetings, check out the presentations linked under “Informational Links” in the sidebar.

Contact

Nick Rupley

Construction Manager

Informational Links

Meet the Contractor 2-9-2026
Aerial of the Sunny Meadows neighborhood with yellow lines showing where storm sewer work will be completed.
Project Area
A black stormwater structure in the Sunny Meadows neighborhood. with debris around it.
December 2024: Drain blockage - standing water
A black stormwater structure in the Sunny Meadows neighborhood.
December 2024: Drain blockage - This project will provide new storm structures to prevent standing water such as this.
Street flooding at the end of a residents driveway in the Sunny Meadows stormwater improvements.
June 2018 - Street Flooding
Flooding at the end of a residents driveway in the Sunny Meadows stormwater improvements.
June 2018 -- Street flooding - a problem this project is aiming to fix.