Sunny Meadows Stormwater Improvements

Page last updated March 24, 2025

Project Background

City Utilities will be working in the Sunny Meadows neighborhood to help alleviate stormwater issues. The neighborhood has been experiencing standing water  (pictured below) near ditches and on roads  following rain events and has been ongoing problem to residents in the area. Construction will help alleviate these issues by the installation of storm ditches, sewers and other structures.
Any pavement, driveway or yard disturbed by construction will be fully restored.

Next public meeting (NEW LOCATION as of 3/10/2025)

March 24, 2025
6:00pm
River Lodge
Shoaff Park Pavilion
6401 St. Joe Road
Fort Wayne, IN 46804

Contact

Nick Rupley

Construction Manager

December 2024: Drain blockage - standing water
December 2024: Drain blockage - This project will provide new storm structures to prevent standing water such as this.
June 2018 - Street Flooding
June 2018 -- Street flooding - a problem this project is aiming to fix.