Victoria Park Area WMR

Page last updated April 21, 2025

Project Overview

Expected completion date: December 2025

City Utilities will be replacing the existing water mains in the Victoria Park neighborhood in order to provide you with the most reliable drinking water service. This replacement is necessary to reduce water main breaks and increase fire flow capabilities, in addition to improving the city’s water delivery system. Currently, the area has cast and ductile iron water mains which are prone to corrosion and breaks. Crews will replace these aging water pipes with  high density polyethylene pipes. The new pipes are flexible and durable.

This project includes nearly 1.08 miles of water main lines. Homes within the project area will be reconnected the new water mains.

This project will include lane restrictions and road closures once construction starts. The City will host a “Meet the Contractor” meeting before construction begins in Winter 2025.

An outline of the Victoria Park neighborhood.

Projects will affect the entirety of the following roads: Asquith Dr.,  Carterton Dr.,  Chartwell Dr., Derbyshire Dr.,  Embassy Dr., Gladstone Dr., Guild Dr.,  Montford Dr., Salisbury Dr

 

DID YOU KNOW?

There are 182 water main breaks on record for the Victoria Park area, ranging from 1978 to 2024.

In case you missed it:

October 09, 2024 – Design meeting presentation: 

[/vc_column_text]

Contact

Shawn Bellinger

Construction Contract Manager

Google Map area of Victoria Park project area.
Project Area
Crews are working on a water main pipe installation in a neighborhood sidewalk. Heavy machinery is being used.
April 2025 - Crews begin exposing water main pipe on neighborhood sidewalks.
Images of the pipes being inserted into the ground.
April 2025 - New flexible pipes are being put in place, replacing old cast iron pipes.