This project is expected to begin construction on Monday, March 17, 2025. Drivers should remain aware of signage and flaggers in the area during time of construction.

Project Overview

City Utilities will be replacing the existing water mains in the Victoria Park neighborhood in order to provide you with the most reliable drinking water service. This replacement is necessary to reduce water main breaks and increase fire flow capabilities, in addition to improving the city’s water delivery system. Currently, the area has cast and ductile iron water mains which are prone to corrosion and breaks. Crews will replace these aging water pipes with  high density polyethylene pipes. The new pipes are flexible and durable.

This project includes nearly 1.08 miles of water main lines. Homes within the project area will be reconnected the new water mains.

This project will include lane restrictions and road closures once construction starts. The City will host a “Meet the Contractor” meeting before construction begins in Winter 2025.

An outline of the Victoria Park neighborhood.

Projects will affect the entirety of the following roads: Asquith Dr.,  Carterton Dr.,  Chartwell Dr., Derbyshire Dr.,  Embassy Dr., Gladstone Dr., Guild Dr.,  Montford Dr., Salisbury Dr

 

DID YOU KNOW?

There are 182 water main breaks on record for the Victoria Park area, ranging from 1978 to 2024.

In case you missed it:

October 09, 2024 – Design meeting presentation: 

[/vc_column_text]

Contact

Shawn Bellinger

Construction Contract Manager