← Return to Projects

St. Joe Center Road Sanitary Main Installation

Page last updated May 14, 2026

Project Overview

Traffic update:

Drivers travelling westbound on St. Joe Center Road will be unable to make a left turn onto St. Joe Road for a limited time. They will be directed to use the following detour:

  • Continue west on St. Joe Center, take a left on N Clinton Street, then left on East Coliseum Boulevard.

City Utilities’ engineers are finalizing a design for a sanitary sewer force main to be installed in the surrounding neighborhoods. The design hopes to bring a 16-inch sanitary sewer down St. Joseph Center Road to a lift station east of Reed Road, next to Medical Protective.

The goal of this project is to help reduce basement backups and sanitary overflows by increasing the capacity of water storage and helping with wet weather flows. Service will not be affected to existing customers but traffic may be affected to those travelling on St. Joe Center Road.

 

Google Maps area of St. Joe Project area

Project Area. To enlarge see below.

In case yo missed it

August 27, 2025 | Design Meeting Presentation 

Contact

Michael Thomas

Construction Manager

Google Maps area of St. Joe Project area
Project Area of St. Joe Center Road (ENLARGE)