Worker securing a rock bolt at the Retrieval Shaft.
Wednesday Oct 9, 2019
Wednesday Oct 9, 2019
Worker securing a rock bolt at the Retrieval Shaft.
Tuesday Sep 10, 2019
Work continues at the Retrieval Shaft (Foster Park) as it continues its downward construction. Photo shows worker examining the progress at an elevation...
Wednesday Aug 14, 2019
Work is progressing at locations throughout the route. The night photo shows crews at the pump shaft (Dwenger & Glasgow) hanging pipe brackets...
Thursday Aug 8, 2019
Work continues at the neighborhood drop shafts, the shafts will intercept flow that currently goes to the river and drop it down to...
Thursday Jul 25, 2019
MamaJo under the Maumee near the Hosey Dam today. Several members of the media visited to observe the progress.
Saturday Jul 13, 2019
Above ground photo shows concrete liners in the distance and inside MamaJo you can see the liners going in place.
Tuesday Jul 9, 2019
Worker being lowered into the 65-foot diameter pump station shaft and photo of MamaJo's used cutterheads and new ones that will be used...
Monday Jul 8, 2019
Rock removed after blast at retrieval shaft in Foster Park.
Friday Jul 5, 2019
Photos below show sections of the concrete liner in place, pieces of liner ready for installation and a view inside MamaJo.
Wednesday Jun 26, 2019
Work is simultaneous throughout the route of the tunnel. From working shaft at Dwenger Avenue to the drop shafts along the five mile...